Measured Proof

Power Quality & Harmonic Filtration Results

Before-and-after metrics captured with logging meters on real facilities — not estimates, not projections.

2.4% – 6.8%

Typical post-install THD range

0.96 – 0.98

Power factor after correction

6% – 12%

Typical peak demand reduction

Recent Projects

Every project starts with a meter, not a guess

Each engagement below began with a Level 2 power quality audit and ended with post-install verification logging.

Manufacturing

Precision Machining Plant

North Las Vegas, NV · 1,200 kVA service · 14 VFD-driven CNC cells

The problem
VFD drives were injecting 5th and 7th order harmonics back onto the service, overheating the main transformer and tripping drives during peak production shifts.
What we did
Level 2 power quality audit followed by tuned passive harmonic filters at the two largest drive panels plus line-side conditioning on the main switchboard.
The result
Nuisance drive faults stopped, transformer operating temperature dropped, and the plant reclaimed capacity without upsizing the service.
Before and after power quality metrics for Precision Machining Plant
MetricBeforeAfter
Voltage THD9.4%3.1%
Current THD (TDD)31%6.8%
Power factor0.790.97
Drive fault trips / month110
Hospitality

Casino Resort Property

Las Vegas Area, NV · 3 MPTS power conditioning units · gaming floor + HVAC plant

The problem
Repeated LED driver failures across the gaming floor and unexplained HVAC motor burnouts, with recorded THD above 38% on lighting panels.
What we did
Three-unit MPTS power conditioning system installed ahead of the lighting and mechanical distribution, with 30-day post-install logging.
The result
LED driver replacements fell to near zero and mechanical maintenance spend dropped materially year over year.
Before and after power quality metrics for Casino Resort Property
MetricBeforeAfter
Voltage THD38%<5%
Power factor0.710.96
LED driver failures / quarter421
Peak demand (kW)1,4101,282
Commercial Real Estate

Multi-Tenant Office Portfolio

Lake Oswego, OR · 4 buildings · 486,000 sq ft combined

The problem
Elevated neutral currents and flickering in tenant spaces, driven by heavy single-phase electronic load and unbalanced panels.
What we did
Harmonic filtration at the shared riser panels, panel rebalancing, and capacitor-based power factor correction sized from 30-day metering.
The result
Tenant flicker complaints ended and utility power factor penalties were eliminated across all four buildings.
Before and after power quality metrics for Multi-Tenant Office Portfolio
MetricBeforeAfter
Neutral current (avg)118 A34 A
Voltage THD7.2%2.4%
Power factor0.840.98
PF penalty / year$21,400$0
Healthcare

Outpatient Surgical Campus

Salt Lake City, UT · Imaging suite + central plant

The problem
Imaging equipment was logging voltage sags and transient events during chiller starts, forcing scan repeats and vendor service calls.
What we did
Transient suppression and conditioning on the imaging branch, soft-start review on the chiller, and continuous power quality monitoring.
The result
Imaging downtime tied to power events dropped to zero over the following two quarters.
Before and after power quality metrics for Outpatient Surgical Campus
MetricBeforeAfter
Sag events / month231
Transients >200 V170
Voltage THD6.1%2.0%
Power-related service calls9 / yr0 / yr

Free PDF Download

Las Vegas Commercial Power Quality Checklist

The same field checklist our Las Vegas engineers use to find voltage, harmonic, lighting, and indoor air problems before they cost you uptime, capacity, or rebate dollars.

  • 40-point walkthrough across 8 systems
  • Voltage, harmonic (IEEE 519) and power factor checks
  • Lighting retrofit and UV air quality items
  • NV Energy rebate and payback verification steps

Where should we send it?

Enter your details and the checklist downloads instantly.

Your information is kept strictly confidential and is never shared or sold.

Free & No Obligation

Request an assessment for your facility

Tell us about your building and we'll show you what power conditioning, lighting upgrades, and UV health products can save you — before you spend a dollar.

  • No-cost facility assessment
  • Results in 48 hours
  • Reply within one business day